Mariners Church Community Center

TAIT was responsible for entitling the remodel of the 30,930 square foot multi-purpose Community Center on the Mariners Church Irvine Campus, which services over 23,000 customers a year.  The 10,664 SF building expansion included an bigger resource center, additional office space and classrooms, reconfiguration of the auditorium for events, and an outdoor patio deck. In addition to providing entitlement services for the project, TAIT permitted all of the construction documents for the project that included architectural, civil, and shoring drawings.  TAIT’s expertise in permit processing enabled the project to be constructed ahead of schedule.

 

OC Animal Care Facility

TAIT was the Civil Engineering Consultant for the County’s Design-Build of the innovative 10 acre OC Animal Care Facility. The facility includes a 2-story 40,000 SF administration building with state of the art veterinary facilities, six dog kennels, special cat housing quarters, and a small corral. The project also includes eight storm water bio-filtration basins to treat storm water runoff from the site before it enters the public storm drain system.

IUSD Aquatic Center

The IUSD Aquatic Center at Woodbridge High School is a state of the art, olympic quality facility located at Woodbridge High School in Irvine, CA.  The facility regularly hosts professional swim meets.  TAIT provided the civil engineering and design for the multi million dollar project.