Location
Dallas, Texas
Project Description
TAIT was contracted by Oncor Electric, the electrical services supplier for northeast Texas, to remove a 12,000 gallon gasoline tank and product piping from their downtown maintenance facility in Dallas, Texas. The site offered many challenges- the site is in a walled compound with low arched entrances and the tank was set between two canopies. TAIT successfully removed the tank, performed soil sampling and provided a closure letter to the Texas Commission on Environmental Quality. We were able to obtain site closure from the TCEQ.