Toyota Logistics Services

Toyota Logistics Services
Location
Port of Long Beach, CA
Project Description

TAIT was contracted under the Project Lead Architect, Lundstrom Associates (now Lionakis-Lundstrom). The fuel system design project was a small portion of a larger project to rebuild the entire Toyota new vehicle port-of-entry facility. TAIT prepared construction document sets for bidding, permitting and construction uses. TAIT performed engineering design tasks as required to install new: Four (4) 10,000 gallon gasoline AST’s (3 existing tanks relocated, 1 new); thirteen (13) fuel dispensing islands; 50’ x 260’ steel canopy; 100% aboveground/overhead piping systems; duplex fuel delivery AST filling system; tank & piping monitor system.